Lumasense-technologies BoilerSpection-SD Manual de usuario Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 90
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
BoilerSpection HD/SD Manual BoilerSpection Installation Guide 30
Figure 22: SD Camera Air Filtration System
A. ½” Regulator
B. Final-Filter
C. Pre-Filter
D. 1” Regulator
E. 1” Check Valve
F. Brass Pressure Switch
G. Power Cable
H. Conduit Body
I. Power Cable
J. Solenoid Assembly
K. ½” Check Valve
Follow standard practices to ensure that air lines are clean before connecting. Check for proper flow
after installation. Plant air supply to the air filtration system is through a 1” NPT ball valve fitting.
Caution: The system requires 40 scfm at 100 psi at each camera location.
A
B
C
D
I
J
K
F
H
E
G
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 89 90

Comentarios a estos manuales

Sin comentarios